FUTURE MEUSE ?

THE GRENSMAAS PROJEKT: ROOM FOR THE RIVER

THE PLAN:

•  Widing the maas -> more room for the river
•  Affront of the dike
•  Deepen the coast
•  Reallocation from around 100 million barrel ground
•  Apply of gravel barriers
•  River is able to collect more water, dikeoutland  becomes wided-Riverline dams get applied to convey faster the water and to strengthen the coast
•  Removing the groinfields
•  Meandering of the channel
•  Heightening of the minimal outward flow
•  Development of vegetation in the outback

Plakat Grensmaas_englisch-1

Today’s state

before grensmaas

After grindwinning

after grensmaas

Future state

futur grensmaas

Leave a comment